It’s been reported that the oil pipeline from Uganda is going to go through Tanzania, not Kenya. Two forgotten facts about the Uganda oil decision are that; (1) President Museveni of Uganda has been steadfast that he wanted to refine oil in Uganda, not export raw crude (2) Uganda’s oil has been said to be waxy or heavy. This means it would require complex heating to keep it flowing along a complex oil pipeline through the rift valleys and hills – to the coast of Kenya.
The cost, insecurity and difficulty of building infrastructure have been cited reasons that Uganda opted to go through Tanzania. Still, Kenya has several LAPSSET projects on the cards including an oil pipeline to go to Lamu where there would be a new highway, railway, coal plant and modern, deep-sea port.
Pipeline Impact
Last year at the TDS Nairobi summit, during the 10th Ministerial Conference (MC10) of the World Trade Organization (WTO), a session was held on local content in extractive (and oil) industries. Some interesting comments there included:
- It is a legitimate objective for any resource-rich country to try to maximize the value of its resources.
- If a country puts restrictions on raw exports, it may distort the local economy; it creates artificial demand – and if it is not efficient, local related industries will not survive.
- Kenya energy expert Patrick Obath suggested that Kenya, Uganda and South Sudan have to talk together and implement projects together for projects like the oil pipeline to be viable. That would also have to happen to get more value-addition from the oil in the countries e.g. can the countries plan to get fertilizer from oil?
- With mining, you have 20 years of opportunity for local suppliers and jobs, but with an oil pipeline that’s only there in the beginning, then goes away once the pipeline is built (there won’t be many local jobs after, and communities don’t get an economic boom from having an oil pipeline passing through their land..which may lead to some local frustration).
More on Kenya Pipeline:
- The Kenya Pipeline Company is charged with transporting and storing petroleum products.
- A (presidential task force on parastatal reforms proposes the Treasury incorporate a holding company known as the Government Investment Corporation (GIC), into which Kenya Pipeline Company should be transferred to determine (its) intended privatization.
- Meanwhile, Kenya Pipeline is continuing with its projects including replacing the current Mombasa-Nairobi Pipeline.